Flood-affected loan instalments: when a lender may extend payment to Poush-end 2083

Nepal Rastra Bank's circular dated 27 Asoj 2083 gives Class A, B and C banks and financial institutions a specific option for affected borrowers. After assessing the borrower and the flood's impact, the lender may extend the payment period for principal and/or interest instalments falling at Asoj-end 2083 up to Poush-end 2083. A borrower needs a lender decision; the circular does not itself rewrite every repayment schedule.

On this pageClass A, B and C lenders: which borrowers fall within point 48?What must the lender assess?Cash-flow illustrationInfrastructure-bank borrowers: a separate permissionMicrofinance borrowers: direct flood impact mattersThe practical decisionSources and references

Key points

  • The relevant instalments are those at Asoj-end 2083, not every future payment.
  • For Class A/B/C lenders, financial position, disruption and loan use must be examined before deciding.
  • More time to pay does not, by itself, cancel principal or interest.

Class A, B and C lenders: which borrowers fall within point 48?

New point 48 covers enterprises, projects or businesses directly affected in the Bhote Koshi and Budhi Gandaki flood-hit area; businesses based on imports or exports of raw materials, semi-finished goods or finished goods through Rasuwa customs; and affected borrowers in flood-hit areas. Establish the factual connection to the stated category rather than relying on a general fall in sales.

For a Rasuwa-linked trader, useful evidence may include consignment, customs and transport records, interruption dates and the effect on sales and collections. A directly affected project can identify its site and operational damage. These are practical suggestions for supporting the lender's assessment, not an extra application form prescribed by the circular.

What must the lender assess?

Point 48 requires a realistic analysis of the borrower's financial condition, including sales and income, cash flow and amounts held in reserve; the effect on imports and exports; and the proper use of the loan. Difficulty paying the instalment must be supported by that analysis. A loss estimate alone does not establish a revised due date.

Identify the instalment and ask the lender to confirm its decision in writing. Reconcile the resulting principal and interest schedule to the loan statement. Poush-end 2083 is the outer payment-extension limit; the circular does not specify a separate borrower application cutoff.

Cash-flow illustration

Assume an importer borrowing from a Class A, B or C institution and linked to Rasuwa has an Asoj-end instalment of NPR 500,000 principal and NPR 100,000 interest, and documented disruption prevents customer collections. The instalment totals NPR 600,000. The borrower submits trade records and a cash-flow forecast. If the lender accepts the factual and financial case, it may extend payment within the stated limit.

This illustration uses assumed facts and was prepared for C.M. & Associates, Chartered Accountants. It is not an NRB example or a promise of approval. NPR 600,000 does not become a grant or write-off. Continuing interest treatment must be established from the applicable loan terms and lawful lender decision; the circular alone does not establish an interest-free period.

Directive amendment Previous provision: This is an addition of point 48 to Directive 2/082. No earlier text is replaced by the circular; this box does not reconstruct all earlier restructuring facilities. Change: New point 48 permits the specified, assessed extension of Asoj-end 2083 instalment payments up to Poush-end 2083. Instrument: NRB Banking and Financial Institutions Regulation Department circular 05/083/84, dated 2083/06/27, adding point 48 to Unified Directives 2082, Directive 2/082. Date and effect: Issued on 27 Asoj 2083; no separate later commencement date is stated. The lender must still exercise the permission.

Infrastructure-bank borrowers: a separate permission

Circular 02/083/84, dated 27 Asoj 2083, adds point 10 to Directive 2 of the Unified Directives 2082 for the licensed infrastructure development bank. It covers directly affected enterprises, projects or businesses in the Bhote Koshi and Budhi Gandaki flood-hit area, and businesses based on raw-material, semi-finished or finished-goods imports or exports through Rasuwa customs.

The infrastructure bank must realistically analyse sales and income, cash flow, reserves and the borrower's other financial circumstances, import/export disruption and proper loan use. For borrowers having difficulty paying, it may extend the principal and/or interest instalment payment period at Asoj-end 2083 up to Poush-end 2083. A Rasuwa-linked business should identify this circular when its lender is the infrastructure bank, rather than use the Class A/B/C circular as that bank's authority.

Infrastructure directive amendment Previous provision: The circular expressly adds point 10; it does not replace an earlier point. This does not describe all earlier rescheduling permissions. Change and instrument: Circular 02/083/84 adds this assessed flood-related extension to Directive 2 of the infrastructure-bank Unified Directives 2082, page 1, point 10. Date and practical effect: Issued 27 Asoj 2083 (2083/06/27); no separate later commencement is stated. The lender may decide on an extension within the stated limit; the permission does not automatically change the borrower's schedule.

Microfinance borrowers: direct flood impact matters

Circular 03/083/84, also dated 27 Asoj 2083, adds point 9 to Directive 2/083 of the Unified Directives 2083 for Class D microfinance institutions. It permits the institution, after analysing the financial position of members directly affected in the Bhote Koshi and Budhi Gandaki flood-hit area, to extend the principal and/or interest instalment payment period at Asoj-end 2083 up to Poush-end 2083 where payment is difficult.

This shorter provision does not contain a separate Rasuwa-customs-trader category. A member whose only connection is trade through Rasuwa should not treat that trade connection alone as qualification under the microfinance circular. Establish the direct flood impact, the financial difficulty and the institution's decision. The detailed assessment list in the Class A/B/C and infrastructure provisions must not be attributed to the microfinance text.

Microfinance directive amendment Previous provision: The circular adds point 9; it does not substitute an earlier point or establish that no other relief existed. Change and instrument: Circular 03/083/84 adds the specified member-based extension to Unified Directives 2083, Directive 2/083, page 1, point 9. Date and practical effect: Issued 27 Asoj 2083 (2083/06/27); no separate later commencement is stated. The microfinance institution's financial assessment and decision remain necessary; the permitted end date is Poush-end 2083.

The practical decision

Identify the lender category first, then establish the facts required by its own circular. Seek a documented decision tied to the actual instalment and financial evidence, and follow the confirmed repayment schedule. The same outer payment-extension limit does not make the three eligibility tests identical.