Long-term contracts: qualification, cumulative schedules and annual reconciliation
Updated by: C.M. & Associates, Chartered Accountants | Latest update: 2 November 2026
A contract needs more than a long payment timetable.
Apply duration and the statutory category
The section 26 explanation requires a contract term exceeding twelve months and a contract for manufacture, installation, construction or related services, or a qualifying deferred-return contract other than an excluded contract. An ordinary contract lasting exactly twelve months does not meet the duration limb. Crossing an income-year end is not itself the test.
Rule 10 treats failure to show the Department-prescribed estimated profit-and-loss particulars for each six-month period after the contract begins as the deferred-return trigger. A late invoice or long credit period alone does not replace that test. Rule 11 excludes contracts arising from an entity interest or retirement-fund membership and investment-insurance contracts. Duration alone therefore does not bring every financial arrangement into section 26.
What the parties originally agreed matters
The Directive measures the contract period by the time accepted for completing the work, including applicable warranty obligations. It distinguishes an originally agreed term from a later accidental delay or early completion. Deliberately manipulating repeated term changes to enter or leave the rules raises a separate characterisation issue.
Even a contract within the definition needs the applicability check. Rule 12(4) disapplies section 26 for a person not required to submit a section 95 estimated-tax statement for the year. Once applicable, completion-based cumulative inclusions and deductions require a separate calculation; certified bills, cash received and contract qualification are different questions.
Key points
- Section 26 combines a duration test with specified contract categories.
- Unexpected delay, investment insurance and estimated-return exclusions need separate checks.
Directive examples 20.1.2-20.1.3: original 2078/79 contracts
In 2078/79, New Nepal Construction agrees to build a Rs 50,000,000 road in sixteen months but completes it in ten: the Directive retains long-term-contract status. A separate Rs 30,000,000 road is agreed for ten months, but a landslide extends work to fourteen months: the Directive does not make it long-term merely because of that unexpected delay. The agreed duration, rather than elapsed time alone, explains the different outcomes.
Current legal position
Apply the actual Act and Rules rather than equating long-term tax accounting with procurement duration, financial-reporting recognition or a construction permanent-establishment test. Each has its own conditions.
Long-term contracts: reconcile cumulative schedules with the current year
Maintain cumulative income and deductible-cost schedules for each qualifying contract.
Start with the qualifying contract and costs
Section 26 and Rule 12 prescribe a cumulative mechanism for qualifying long-term contracts. First establish that the contract is within those provisions and is not excluded, including by Rule 12(4). A project extending across year-end is not sufficient by itself.
For manufacture, construction, installation and related services, Rule 12(3)(a) compares cumulative deductible amounts with estimated deductions at completion. The Directive explains the direct-cost calculation. Technical project costs and tax deductions need separate checks: a cost recorded by the engineer or accountant is not necessarily deductible under the Act.
A cumulative schedule is not another year of turnover
Directive example 20.13.2 shows cumulative inclusions of Rs 22,000,000, Rs 55,000,000 and Rs 88,000,000. Its row labelled income included in the return is cumulative. Annex 2 requires separate supporting schedules showing previous-year, current-year and cumulative amounts. Preserve those columns rather than replacing the cumulative schedule with a single annual figure.
The annual reconciliation must also identify amounts already recognised. The separate example 20.14.2 expressly subtracts previously included income and previously deducted expenditure to obtain current-year amounts. Read together, these illustrations support retaining the cumulative schedule and bridging it to the current year. Adding the full cumulative amount again to ordinary annual income would duplicate earlier recognition. This is the firm’s reading of the linked schedules, not a claim that IRD has issued a new clarification.
Key points
- Subtract previously recognised amounts when reconciling the current-year movement.
- Revised estimated costs and agreed variations can change that movement.
Reconcile deductions as well as inclusions
Under Rule 12(2), deductible amounts are also cumulative. Directive example 20.14.1 distinguishes actual project spending from tax-allowable costs. Carry the cumulative allowable total forward and identify the current-year movement; do not deduct both the cumulative total and its annual increment. Statutory deduction limits and loss rules continue to apply.
Update the inputs when the estimate changes
A revised completion-cost estimate changes the denominator from the relevant year. Additional consideration requires its own contractual entitlement; a cost overrun does not automatically increase the agreed price. Annex 2 separately records changes in estimated income and costs and addresses an estimate below income already included. Reconcile each contract separately, then link its schedules to the annual return and other business items.
Directive example 20.13.2 - cumulative income and annual movements
The original four-year road contract has consideration of Rs 110,000,000 and estimated cost of Rs 100,000,000. Completion is 20% in 2076/77, 50% cumulatively in 2077/78 and 80% cumulatively in 2078/79. The Directive shows annual income movements of Rs 22,000,000, Rs 33,000,000 and Rs 33,000,000, alongside cumulative inclusions of Rs 22,000,000, Rs 55,000,000 and Rs 88,000,000. The two rows answer different questions.
Directive example 20.14.1 - a separate deductible-cost illustration
For its cost illustration, the Directive gives actual spending of Rs 20,000,000, Rs 30,000,000 and Rs 30,000,000, of which Rs 200,000, Rs 500,000 and Rs 1,000,000 are not deductible. Annual allowable costs are therefore Rs 19,800,000, Rs 29,500,000 and Rs 29,000,000; the cumulative totals are Rs 19,800,000, Rs 49,300,000 and Rs 78,300,000. These are the cost example’s own assumptions. They are not silently substituted into the completion percentages of the separate income example.
Current legal position
Use the cumulative contract schedules together with the annual reconciliation. The figures preserve separate historical Directive examples; they are not a completed taxpayer return or a computation of the tax payable. Section 26, Rule 12 and the applicable year’s deduction rules govern the actual contract.
Related analysis
Download Annex 2 - long-term contract supporting schedules
The original IRD schedules cover completion percentage, cumulative income, deductible costs and changes in estimated completion costs. Keep the previous-year, current-year and cumulative columns separate. This two-page extract retains the official Nepali layout from the Fifth Amendment 2081 edition, PDF pages 683-684 (printed pages 665-666).
Download the official Annex 2 extract (Nepali PDF)
IRD publication page and complete Directive
Use this as the supporting schedule, read with section 26, Rule 12 and the applicable return requirements. It is separate from D03 Annex 10 for tax payments and credits.