Accounting, Audit & Reporting
Audit Firm Quality Management in Nepal — From Risks to Evidence
ICAN's NSA 2024 table and AuSB's publication distinguish earlier quality-control provisions from the new NSQM 1, NSQM 2 and revised engagement-quality requirements. The new/revised quality-management standards have mandatory compliance from 1 Shrawan 2083 under the published timetable. Confirm the applicable period and any later pronouncement before concluding that an old NSQC file is sufficient.
A quality-management system should respond to the firm's nature and circumstances. Small size does not eliminate the need to identify quality objectives, risks, responses, monitoring and remediation. A manual copied from a large network is ineffective if its described reviewers and systems do not exist.
1. System design
| Component | Practical evidence |
|---|---|
| Governance | Responsibility, accountability and quality priorities |
| Ethics | Independence confirmations and conflict checks |
| Acceptance | Client integrity, competence, capacity and engagement risks |
| Performance | Direction, supervision, review and consultation |
| Resources | Competent people, methods and technology |
| Information | Communication and usable quality records |
| Monitoring | Findings, root causes and corrective action |
Engagement quality review, where required, needs an eligible reviewer, appropriate timing and documented completion. It is not a signature added after issuing the report. Consultation should record the question, advice, conclusion and implementation.
2. Nepal example
A small firm accepts a new regulated client requiring specialist valuation expertise. The quality assessment identifies a competence gap before acceptance, arranges an appropriately qualified resource, documents responsibilities and plans review. If the resource cannot be obtained, the firm must address whether it can accept or continue the engagement. A generic annual training attendance list does not resolve the specific gap.
3. Monitoring and remediation
Evaluate findings for significance and recurrence, identify root causes and implement proportionate responses. Track whether the correction works. A late file sign-off may reveal a scheduling or supervision weakness rather than only one missing signature. Preserve original findings and corrective evidence instead of rewriting the inspection record.
4. Annual evaluation
The responsible person should evaluate the system using the applicable standard and evidence, documenting deficiencies and remediation. Confirm the current ICAN/AuSB timetable and the firm’s engagement scope when performing that evaluation.
5. The mandatory timetable has already arrived
ICAN's published NSA 2024 table gives mandatory compliance from 1 Shrawan 2083 for NSQM 1, NSQM 2, NSA 220 (Revised), NSA 600 (Revised) and NSRS 4400 (Revised). As at 12 October 2026, a firm should assess the applicable engagement and reporting period against that timetable. An old quality-control manual labelled NSQC 1 is insufficient evidence that the new requirements have been implemented.
Quality management begins with the firm's circumstances. A sole practitioner serving a few private companies faces different resources and engagement risks from a firm auditing regulated groups, but both need a reasoned system appropriate to their work. A smaller firm can document a proportionate system; it should not treat size as an exemption from the applicable standard.
6. Build responses around actual failure risks
A firm identifies recurring problems with late client records, dependence on one specialist and insufficient time for senior review. Its responses might include acceptance criteria requiring reliable reporting capacity, earlier specialist involvement, a backup resource arrangement and protected review milestones. The response should show how it reduces the identified risk.
Responsibility must be explicit. Assign who approves acceptance, monitors independence, appoints reviewers, checks consultation outcomes and assesses completed engagements. Where an engagement quality review is required, confirm reviewer eligibility and timing under NSQM 2 and the engagement standard. A colleague's informal read-through is not automatically an engagement quality review.
7. Monitor the system and evaluate remediation
For example, a review finds that related-party disclosures were omitted in several company audits. The firm investigates whether the cause was the client questionnaire, audit planning, staff understanding or review practice. It then revises the relevant response and examines later engagements to see whether the issue recurs.
Annual evaluation should draw on monitoring results, complaints, external inspection findings and changes in the practice. Keep the conclusion, evidence and unresolved deficiencies. The objective is a system that supports consistent engagement quality and addresses weaknesses before they become routine, not a large manual assembled once and left unchanged.
Official sources
- ICAN — NSA 2024 pronouncement and effective-date map
NSA 2024 quality-management phased table · New/revised table NSQM 1,NSQM 2,NSA 220 Revised,NSA 600 Revised,NSRS 4400 Revised
- ICAN — Effective dates of NFRS, NAS and NSA, December 2025
- Auditing Standards Board — NSA 2024, Volume II
Official reference; see source-review scope · Not independently verified in every substantive provision
Before using this guide
Source review: 12 October 2026
The sources support the scope of this general guide. Before applying it, check the actual entity, transaction, reporting period and any later amendment.
Checks for your case
- Apply the cited provisions to the actual entity, transaction and period. Use the relevant authority’s current forms, instructions and accepted decision for a real filing.
Latest update
- 13 October 2026
Editor: C.M. & Associates
Updated the article presentation and navigation. The cited source-review dates and any transaction-specific limitations still apply.